+86 755 8379 9042 sales@trident-logistic.com EN中文PTES
Home/Special Cargo
OOG · Breakbulk · RORO

Cargo that won't fit in a box, moved without surprises

Flat racks, open tops, heavy-lift parcels and RORO space from Shenzhen, Ningbo and Shanghai to Santos, Itajaí, Veracruz, Callao and San Antonio. Over-width, over-height and lashing charges sit on the quote — before you book, not at the counter.

Connecting the world, delivering with care!

Four photos of the piece answer more than a page of text — the base and the lifting points included. Rather fill a form? Send dimensions →

CTR TOP 2.59 m 3.40 m 11.00 m OOG · 40' FLAT RACK · DECK STOW 32 t · 2.95 m WIDE (OWS) 2.95 m SECTION · OVER-WIDTH
Indicative stow — 40' flat rack, deck positionNot to scale
Watch it move

From six Chinese ports to three Latin coasts — in 42 seconds

Flat rack, open top, breakbulk and RORO all travel the same water. This is the lane we run every week, and the cargo that moves on it.

Get a quote
  • OOG — flat rack & open top
  • BBK — heavy-lift breakbulk
  • RORO — roll-on / roll-off
  • The lane — Asia → Latin America
WCA · ID 151505China Global member — look us up
Since 2014China ↔ Latin America, one lane only
EN · 中文 · PT · ESSame desk, same person
Line by lineOWS, OHS, crane, lashing — never buried
Pick the mode

Three ways to move cargo that doesn't fit

The cheapest answer is almost never the one you asked for. We test the piece against all three before quoting, and tell you which one we would book with our own money.

01 OOG out-of-gauge

It ships, it just doesn't fit the steel box

Too wide, too tall, too long, or heavier than the container payload. The box keeps its place in the vessel but the walls, roof or both come off.

Typical
CNC and injection machines, transformers, excavators, buses, steel structures, oversize moulds
Equipment
20FR / 40FR / 20OT / 40OT / 40' platform
Envelope
single 40FR: ~3.1 m wide, 3.6 m high, 38 t
Beyond it
two flat racks or a platform bed — still a weekly container sailing, not a charter
Equipment limits →
02 BBK breakbulk

When the lift is beyond any container

Pieces lifted by crane into the hold or onto the hatch of a multipurpose vessel — 40 tonnes and up, 16 metres and longer, or simply too awkward to cradle on a flat rack.

Typical
Generators, turbines, plant modules, rails, coated pipe, wind components, presses
Equipment
Scheduled MPP tonnage, ship's gear 80–250 t, cribbing and seafastening
Envelope
no fixed limit — the ship, the hatch and the crane decide
Our limit
liner MPP to about 120 t a lift. Past that we hand you to a charter partner rather than pretend
Check whether breakbulk is really needed →
03 RORO roll-on / roll-off

Anything that rolls, rolls on — if the ship will take it

Vehicles and wheeled or tracked equipment drive or are towed aboard over a stern ramp. No dismantling, no crane at either end — but tracked units need dunnage under the tracks, and some carriers refuse them outright because tracks chew the ramp.

Typical
Buses, trucks, tractors, excavators, dozers, forklifts, trailers, new vehicles
Priced
per unit or per running metre — never per CBM, which is why RORO and flat rack quotes never line up
Declare
fuel level, battery state, keys, loose tools, cleanliness — one missing item keeps it on the quay
Used units
Brazil does not admit used vehicles in practice — clear the destination rule before you sell one
Which LatAm ports have RORO calls →

Half the cargo quoted as "breakbulk" fits on two flat racks for a third of the price. Before a customer charters tonnage, we test the piece against 2 × 40FR, a platform bed, an open top and a deck stow. If breakbulk is genuinely the only answer, we will say so — and show you the numbers that got us there.

The other half is the reverse: a 12-tonne piece that everyone books on a flat rack and that a 40' open top would have carried for less, because nobody checked the height against the door.

And before either number matters we ask the question that saves the most money: can it be dismantled or split? A removable hood, counterweight or boom often turns a 3.4 m machine into a 2.6 m one that ships in an open top — roughly half of a flat rack plus crane work.

Cargo fit checker

Will it fit? Get an indicative answer in ten seconds

Enter the largest single piece. You get the equipment it needs and the surcharges that will follow — enough to sanity-check a quote before you spend a day collecting them.

Working figures only — the real limit is the vessel's stow plan, the carrier's approval and the crane on the quay. Not sure about a dimension? Send four photos and you get an answer the same working day.

Indicative equipment
Enter length, width, height and weight

The largest single piece is what matters, not the total shipment.

Equipment & limits

The numbers that decide whether you need special equipment

Indicative working envelopes for the equipment we book most often to Latin America. Every one of them is subject to carrier approval and vessel stow — which is why we confirm in writing before the booking is placed.

Line 1 · does it fit at all

2.35 m wide · 2.39 m high · 5.90 / 12.03 m long

Inside dimensions of a standard container. Past this line the cargo cannot travel as a normal box booking — it needs a flat rack, an open top or a platform.

Line 2 · do you pay extra for it

2.438 m wide · 2.591 m high · 12.19 m long

Outside dimensions of the box — the slot it occupies on the vessel. Past this line the carrier charges OWS, OHS or OOL, at whatever tier its tariff uses.

The gap between the two lines is where money is won and lost. A piece 2.40 m wide does not fit in a box, but sits inside the slot width — so it travels on a flat rack without an over-width surcharge. A 2.70 m piece pays OWS on top of the flat rack itself.

EquipmentFloor / internal size (L × W × H)Practical cargo envelopeWhere it bites
20' Open Top 5.90 × 2.35 × 2.35 m up to 2.68 m high, 26 t Loaded from above, closed with a tarp — weaker against rain than a closed box. Over-height always needs carrier approval.
40' Open Top 12.03 × 2.35 × 2.35 m up to 2.68 m high, 26 t The cheapest answer for "too tall but not too wide". Cannot be stacked, so it is often first to be rolled.
20' Flat Rack 5.95 × 2.35 m floor 2.90 m wide, 2.60 m high, 28 t Booked at 40-foot rates by most carriers — check the tariff before assuming it is the cheap option.
40' Flat Rack 12.00 × 2.35 m floor 3.10 m wide, 3.60 m high, 38 t Above 2.44 m wide it is OOG and stows on deck only. Deck slots are the scarce resource in peak season: a carrier with no deck position simply refuses the booking.
40' Platform 12.00 × 3.00 m 3.60 m wide, 4.20 m high, 45 t No end walls and no lashing rings where you expect them — securing is designed per piece.
MPP breakbulk hold / hatch 12–20 m single lifts to ~120 t Monthly sailings, not weekly, and the ship's crane — not the container yard — sets the limit.
PCC / PCTC (RORO) deck height 4.5–6.5 m per unit, typically ≤ 60 t Ramp angle and deck height rule out tall units; fuel level and battery state must be declared.

Indicative working figures, not carrier tariffs. Actual limits depend on vessel stow, stack weight, port crane capacity and road permits — and on whether a deck slot exists on the sailing you want.

Where the money goes

Six line items turn a flat rack rate into a real number

The ocean freight is the part everybody compares. It is rarely the part that moves the total by 30%.

01

Freight basis

Per flat rack unit, per freight tonne (W/M) on breakbulk, or per running metre on RORO. Not per CBM — a 3 CBM piece can book as a full 40-foot flat rack.

02

OOG surcharges

OWS above 2.44 m width, OHS above 2.59 m height, OOL beyond 5.90 / 12.19 m length. Tiers differ by carrier, and that is where quotes drift apart.

03

Lashing & securing

Materials, a surveyor and a plan that survives the voyage. On a flat rack this is a real cost, not a rounding error — and it is the first thing stripped to look cheap.

04

Crane & port handling

Heavy lift at origin, at destination, or both. The lift can cost more than the ocean leg when the piece needs a mobile crane and a night permit.

05

Pre-carriage & permits

Low-bed trailer, escort and road permit once the piece passes 2.55 m wide or 4.0 m high. Cross-province over-limit permits take 15–20 working days — this, not the vessel, is what misses sailings.

06

Insurance

Priced per shipment, and OOG is rated above general cargo. Read the lashing-failure exclusion before you assume "all risk" covers a shifted machine.

Same 40' flat rack, same sailing, quotes USD 800 apart. One included the over-width tier and the lashing survey; the other discovered both after the cargo was on the quay. A special-cargo quote is only comparable line by line — so that is how we send it.

The line nobody asks about is free time. Ten days of terminal storage for a 30-tonne machine at Santos can cost more than the ocean freight on a 20-foot box, and OOG storage is charged by the day. Our quotes show free time and storage days next to the rate, so the number you compare is the number you pay.

Every quote carries 14 days' validity. OWS tiers and flat-rack releases move weekly. A number three weeks old is a number we cannot honour, and we would rather say so before you plan around it.

Reading a breakbulk quote

Four terms that make two quotes incomparable

Same cargo, same vessel, same sailing. One quote is FIO and the other is FLT — that difference alone is 20 to 30%, and it is invisible unless you know to look.

FLTFull liner terms

The line loads at origin and discharges at destination. What container freight normally includes — and the term to insist on when you compare a breakbulk rate against an FCL rate.

FIOFree in and out

You pay the crane at both ends. Correct for project cargo where the shipper brings its own gear — and the reason a "cheap" breakbulk rate sometimes turns out not to be cheap.

FIOSTFree in, out, stowed & trimmed

You also pay for stowage, lashing and dunnage on board. On heavy parcels this is the largest line after the freight itself, and the one most often left off the comparison.

H/HHook to hook

The carrier's responsibility starts and ends at the ship's hook. Everything on the quay — crane, trailer, permit, storage — sits outside it, on your side of the line.

When you compare, compare the same term. Send us another forwarder's rate and we will tell you which of the four it is — five minutes of work that usually explains the whole gap. If their number wins even on the same basis, we will say that too.

How it runs

Five steps, one owner, no handoffs at the crane

STEP 01

Dimensions in

L × W × H, weight, centre of gravity, lifting points, photos of the piece and its cradle — and one question first: can it be split?

STEP 02

Fit & concept

Tested against flat rack, open top, platform, breakbulk and RORO. Stowage concept and cost lines in 48 hours; the formal lift plan follows the booking, not the enquiry.

STEP 03

Equipment & space

Flat rack or open top released, MPP tonnage or PCC space booked, deck stow confirmed before cut-off.

STEP 04

Handling on the ground

Crane, lashing materials and a surveyor at origin — the same arranged at destination before the vessel sails. The secured cargo is photographed, and the report reaches you within 24 hours of sailing.

STEP 05

Documents & delivery

House B/L, packing list, insurance certificate, and a destination agent who already knows the cargo is out-of-gauge.

What we need before we can quote

  • 1Can it be dismantled or split?Ask before you measure. A removable hood, counterweight or boom often changes the equipment entirely — and halves the cost.
  • 2Largest piece: length × width × heightMeasure the skid or cradle, not the machine.
  • 3Weight and centre of gravityPer piece if the shipment is split across two units.
  • 4Lifting points and photosFour angles, plus the base — this decides sling or spreader.
  • 5Pickup address and accessWhether a crane or a low-bed can reach the door, and how much lead time the over-limit permit needs.
  • 6HS code, consignee and delivery addressUsed machinery into Brazil needs an import licence before sailing.

Send it the way you already have it

A photo of the packing list and four photos of the piece are enough to start. We will come back with the questions we still need answered, not a form to fill in.

Same working day answer on whether it is OOG at all
Stowage concept and cost lines within 48 hours of dimensions
Formal lift and lashing plan in 3–4 working days once booked
Photo report of the secured cargo within 24 hours of sailing
Quote valid 14 days, with free time and storage days shown
English, 中文, Português or Español — same desk
Destination reality

The piece is only half the problem. The port is the other half.

Special cargo fails at destination far more often than at origin — a crane that is booked, a licence that is not, a terminal with nowhere to put a 30-tonne machine while it clears.

Brazil — Santos · Itajaí · Paranaguá · Rio Grande · Suape

Used machinery needs an import licence (LI) filed before the vessel sails, not on arrival — and Siscomex / RADAR set-up decides whether your flat rack waits at the terminal for a fortnight. We start that paperwork at booking. One warning on RORO: Santos calls are built around vehicle imports, so export space for machinery is thin and booked per sailing.

LI before sailingSiscomexRADARHeavy lift on berth

Mexico — Veracruz · Manzanillo · Altamira

Padrón de Importadores is the gate, and some machinery also needs NOM certification. Veracruz handles project cargo well; Manzanillo's storage for out-of-gauge units is tight in peak season, so terminal space gets booked early.

PadrónNOMBook storage early

Andes — Callao · Guayaquil · Buenaventura

Callao is the main heavy-lift gateway for Peru and the routing most Andean project cargo uses. Direct calls matter: a transhipment adds a second lift, and a second lift is where a cradle gets damaged.

Direct call preferredOne lift, not twoHigh-altitude inland legs

South cone — San Antonio · Valparaíso · Buenos Aires · Montevideo

San Antonio and Valparaíso both take flat racks; San Antonio carries the stronger RORO call for vehicles and equipment. For Asunción, the river feeder caps both draft and crane capacity — check the piece weight before the routing is fixed.

RORO callsRiver feeder limitsPlate draft
Questions we actually get

Special cargo, answered plainly

Two different numbers decide it, and they are not the same number. To fit inside a box: 2.35 m wide, 2.39 m high, 5.90 or 12.03 m long — the internal dimensions. To be charged as out-of-gauge: 2.438 m wide, 2.591 m high, 12.19 m long — the outside dimensions, the slot the box takes on the vessel. Past the first line you need special equipment; past the second you also pay OWS, OHS or OOL. A 2.40 m wide piece does not fit in a box, but sits inside the slot, so it travels on a flat rack without an over-width surcharge.
No. Two flat racks usually beat a breakbulk parcel for pieces between 12 and 20 tonnes, and they sail weekly instead of monthly. Breakbulk wins above roughly 40 tonnes, or once the length passes 16 m and no container arrangement fits. We price both and tell you which one we would book.
Often, yes — and it is the first thing we ask. A removable hood, counterweight, boom or outrigger can turn a 3.4 m machine into a 2.6 m one that travels in a 40' open top for roughly half the cost of a flat rack plus crane work. It costs ten minutes of measuring and one call to the factory. If the piece genuinely cannot be split, that is worth knowing early too, because it is what pushes a quote into breakbulk.
10 to 14 days before the sailing. Carriers release flat racks and open tops against a confirmed cargo description, and there are far fewer units in the pool than dry containers — the ones that exist are usually already promised to someone. Breakbulk and RORO space: 3 to 4 weeks out. And start the over-limit road permit earlier still: 15 to 20 working days for a cross-province permit, which is the most common reason a booked flat rack sails without its cargo.
Yes, and in a tight season it is often the fastest route. A used 40' flat rack trades for roughly USD 8,000–12,000 and pays back in two or three shipments once release lead times stretch to three weeks. Shipping on your own SOC unit also takes you out of the queue for the same scarce pool — and the unit stays yours for a return leg if you have one.
Yes. We book surveyed operators at origin and destination, collect the load charts in advance and confirm lifting points before the truck arrives. A lift that gets improvised on the quay is how cradles break and insurance claims start.
Then it rolls. RORO with MAFI trailers handles self-propelled and towable units, and skidding onto a platform with a winch covers the rest. If neither works, the piece gets split — which is a manufacturing decision, so it is better to know now than at the port.
Yes — per shipment or under an annual open policy. OOG and project cargo are rated above general cargo, and lashing failure is a named exclusion in most wordings. That is exactly why we arrange a pre-shipment survey and a photographed loading report on anything above 20 tonnes: the survey report is what a claim is actually built on, not the policy wording.
Send the dimensions

Six fields. We ask the rest.

You do not need a packing list or a CAD drawing. The largest piece, the weight and two ports are enough for a working number — we come back with the questions that are genuinely missing, not a form to complete.

  • Same working day: is it OOG at all, and which mode
  • 48 hours: stowage concept and the cost lines
  • 14 days' validity, free time and storage days shown
  • Photos move it fastest — four angles plus the base

Rather type than fill a form? WhatsApp four photos or email sales@trident-logistic.com.

Opens your own mail app with everything filled in — no server, nothing stored. Photos can follow in the reply or on WhatsApp.

Ready to move cargo between China and Latin America?

Send us your origin, destination, cargo description and target date. You will receive a clear, itemised quote — no hidden charges.

Get a Quote WhatsApp